GARY HUNTER’S CHESSIE SYSTEM (HO)

This layout will be available for viewing on Friday, July 18, 2025.

Gary’s layout is focused on Unit Coal and Merchandise trains with through traffic using eleven (11) staging yard tracks. Some local operations for coal origination and use are included. ABS (Automatic Block Signaling) using JMRI C&O logic. He has a double track mainline with 30º/32º typical mainline radius with easements and superelevated mainline curves.

LAYOUT SUMMARY

SCALE: HO

ERA: 1982

RAILROAD: Chessie System

SCHEME: Set in the New River region of West Virginia

SIZE: 37.5’ x 27’ overall

MAINLINE LENGTH: ~4 scale miles of mainline

SCENERY COMPLETION: 50%

DATE: Friday, July 18, 2025

HOURS OPEN: Noon to 6:00PM

HANDICAP ACCESSIBLE: NO

PARKING: Please Park in or on either side of the driveway, if possible, or on the lawn in front of the road, if needed. Please do not block Crest Court.

ENTRY: Follow marked path downhill, through gate, to basement entrance (there are no stairs, but there is a hill).